Khatoon Abad Copper Smelter, Kerman, Iran

4 Feb

LOCATION : Khatoon abad copper smelter, Kerman, IRAN

CLIENT : Kanazin Engineering Company

PERIOD: 2009 – 2010

The existing flash smelter which was constructed with NFC patent, shall be modified and renovated to increase the capacity from 80,000 TPY to 200,000 TPY Anode copper from concentrate. Kanazin Co. was the main consultant of this project for more than 1 year.

Scope of work included engineering, design, preparing tender, selecting contractors, and finally supervising.

IRANCAGROUP as a partner of KANAZIN was working as a coordinator of the project in these specific areas:

Defining different modification modules based on the reported defects from various department.

Establishing activities break-down for whole plant considering their interlocking, predecessors, and transpositions.

Planning, controlling, and reporting project progress (More than 3500 tasks and 5 different contractors)

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *